ICF Calculator

Estimate ICF block quantities and approximate costs for your project. For accurate pricing and professional takeoffs, call us with your plans.

๐Ÿ“ Project Dimensions

๐Ÿ“Š Estimated Materials

Gross Wall Area -- sq ft
Net Wall Area (minus openings) -- sq ft
ICF Blocks Needed --
Corner Blocks --
Concrete (cubic yards) --
Estimated ICF Material Cost $--

โš ๏ธ This is a rough estimate for planning purposes only. Actual quantities depend on your specific design, openings, and other factors. For accurate pricing, send us your plans for a free professional takeoff.

Want Accurate Numbers?

Send us your plans and we'll provide a detailed material takeoff with exact quantities and current pricing โ€” completely free.

๐Ÿ“ž Call 512-410-9692

How ICF Material Calculations Work

Calculating ICF materials requires knowing your wall area, opening sizes, and the number of corners. Here's the basic approach:

Gross Wall Area = Perimeter ร— Wall Height ร— Stories

Openings Area = (Avg Window Size ร— # Windows) + (Avg Door Size ร— # Doors)

Net Wall Area = Gross Wall Area - Openings Area

Blocks Needed = Net Wall Area รท 6 sq ft per block ร— 1.05 (waste factor)

Standard Nudura blocks cover 6 square feet each (48" ร— 18"). We recommend adding 5-10% for cuts and waste. Corner blocks are calculated based on the number of corners and wall height.

Factors That Affect ICF Costs

Several variables influence the final cost of an ICF project:

  • ICF Series: Standard forms cost less than Plus+ or XR48 (higher R-value)
  • Core Size: Larger cores (8", 10") use more concrete and cost more
  • Project Complexity: Many corners, curves, or custom details increase labor
  • Local Concrete Prices: Concrete costs vary by region and demand
  • Accessories: Bracing, bucks, rebar, and fasteners add to material costs
  • Order Size: Volume discounts available on larger orders

As a rough guide, ICF wall systems typically run $8-15 per square foot of wall area for materials (forms + concrete + rebar). Installation labor varies by region and contractor experience.